Thursday 2 February 2012

Deadline 2

Deadline Two – Pre-Production Planning

A completed storyboard for the entire opening (preferably having used ‘post it’s), including initial ideas about title placing. 
This needs to be made into an animatic of approximately the same length as the final film will be (shots to be timed carefully) with a voice-over explanation and embedded onto the blog.

Also
- a synopsis for the whole film narrative from which this will be the opening (about 100 words),
- the script for any dialogue,
- list of roles (see pre-production planning advice)
- images of locations and decisions about locations,
- prop research and justification in terms of character and story
- health and safety, including risk assessments for filming and use of equipment.
- lighting decisions. 

Blog Heading “Pre-Production Planning”(clearly label which group member has taken responsibility for each of the various posts). 

Again, consider blog format – images, text, screen grabs, embedded video, hyperlinks, etc

If you want to film over half term, this needs to be handed in earlier in order that we can check it through and grant permission.

Deadline - Friday 10th February

No comments:

Post a Comment